Free GATE CE mock test — 65 questions, GATE marking
One GATE CE paper in the real exam format: 65 questions across one timed section, 3 hr on a server-controlled clock.
About the real exam GATE Civil Engineering — one of India's largest GATE branches and the gateway to M.Tech at IISc/IITs, PSU jobs, and government engineering services.
Free, reversible until you begin · one attempt per account · no retake, no card.
- Sections
- 1
- Questions
- 65
- Duration
- 3 hr
- Max marks
- 100
The paper, start to finish
| # | Section | Questions | Time | Marking |
|---|---|---|---|---|
| 01 | GATE CE — Full Mock Calculator | 65 | 3 hr | Scored out of 100 marks; wrong answers can cost marks |
| Whole paper | 65 | 3 hr | 100 marks |
Navigation: move freely between questions within a section.
Sample questions with worked answers
8 original practice questions written by Myndaq in the GATE CE style. They are not taken from this mock paper or from official past papers. Try each one, then open the answer.
- Question 1General AptitudeOne correct answer
A crew of 6 workers completes 40% of a road-marking job in 8 days. Assuming every worker works at the same constant rate, how many ADDITIONAL workers must join the crew so that the remaining work is finished in exactly 6 more days?
- 4
- 6
- 8
- 12
Show answer and explanation
Answer: B
The crew puts in 6 × 8 = 48 worker-days for 40% of the job, so 1 worker-day does 40/48 = 5/6 % of the job.
The remaining 60% needs 60 ÷ (5/6) = 72 worker-days. To finish in 6 days the crew must have 72 ÷ 6 = 12 workers, so 12 - 6 = 6 more workers must join.
12 is the total crew size, not the number of additional workers. 8 would be the total crew if the remaining work were wrongly taken as 40%, and 4 extra workers (10 in all) would take 7.2 days.
- Question 2Engineering MathematicsType a numeric answer
Using the trapezoidal rule with a step size h = 0.5, the approximate value of the integral of x³ from x = 0 to x = 2 is ______.
Show answer and explanation
Answer: 4.25
The nodes are x = 0, 0.5, 1, 1.5, 2 with f(x) = x³ values 0, 0.125, 1, 3.375 and 8.
Trapezoidal rule: I ≈ (h/2)[f0 + 2(f1 + f2 + f3) + f4] = 0.25 × [0 + 2(0.125 + 1 + 3.375) + 8] = 0.25 × (9 + 8) = 0.25 × 17 = 4.25.
The exact value is 2⁴/4 = 4. The trapezoidal rule overestimates here because x³ is convex on [0, 2]. Simpson's 1/3 rule would give exactly 4, since it integrates cubics without error, but the question asks for the trapezoidal value.
- Question 3Structural EngineeringType a numeric answer
A simply supported beam of span 6 m has a rectangular cross-section 300 mm wide and 600 mm deep. It carries a uniformly distributed load of 20 kN/m over the whole span (self-weight included) and a concentrated load of 30 kN at midspan. The maximum bending stress in the beam, in N/mm², is ______.
Show answer and explanation
Answer: 7.5
Both loads produce their largest moment at midspan, so the moments add there.
M = wL²/8 + PL/4 = 20 × 6²/8 + 30 × 6/4 = 90 + 45 = 135 kN·m = 135 × 10^6 N·mm.
Section modulus Z = bd²/6 = 300 × 600²/6 = 1.8 × 10^7 mm³.
Maximum bending stress = M/Z = 135 × 10^6 / (1.8 × 10^7) = 7.5 N/mm². Using wL²/8 alone (5.0 N/mm²) or PL/8 for the point load (6.25 N/mm²) are the usual slips.
- Question 4Geotechnical EngineeringOne correct answer
A fully saturated clay sample has a water content of 30% and a specific gravity of solids of 2.65. Taking the unit weight of water as 9.81 kN/m³, the saturated unit weight of the clay is closest to
- 9.02 kN/m³
- 14.48 kN/m³
- 18.83 kN/m³
- 24.35 kN/m³
Show answer and explanation
Answer: C
For a saturated soil Se = wG with S = 1, so e = 0.30 × 2.65 = 0.795.
γsat = (G + e)γw / (1 + e) = (2.65 + 0.795) × 9.81 / 1.795 = 3.445 × 9.81 / 1.795 ≈ 18.83 kN/m³.
14.48 kN/m³ is the dry unit weight Gγw/(1 + e), and 9.02 kN/m³ is the submerged unit weight γsat - γw. 24.35 kN/m³ comes from wrongly taking e = w/G = 0.113.
- Question 5Water Resources EngineeringType a numeric answer
A rectangular concrete channel 4 m wide carries uniform flow at a depth of 1.5 m. The bed slope is 0.0009 and Manning's roughness coefficient is 0.015. The discharge in the channel, in m³/s (rounded to two decimal places), is ______.
Show answer and explanation
Answer: 10.78 to 10.88
Flow area A = 4 × 1.5 = 6 m². Wetted perimeter P = 4 + 2 × 1.5 = 7 m. Hydraulic radius R = A/P = 6/7 = 0.857 m.
Manning's equation: V = (1/n) R^(2/3) S^(1/2) = (1/0.015) × 0.857^(2/3) × √0.0009 = 66.67 × 0.9023 × 0.03 = 1.805 m/s.
Q = A × V = 6 × 1.805 ≈ 10.83 m³/s.
A common error is to treat the channel as wide and use R = depth = 1.5 m, which overestimates the discharge (about 15.7 m³/s) because the side walls add a lot of wetted perimeter in a 4 m channel.
- Question 6Environmental EngineeringOne or more correct answers
Which of the following statements about water and wastewater treatment are CORRECT?
- The 5-day BOD of a wastewater sample at 20 °C is always greater than its ultimate carbonaceous BOD.
- In breakpoint chlorination, a free chlorine residual builds up only after the dose passes the breakpoint, by which point most of the chloramines have been oxidised.
- In the activated sludge process, a longer mean cell residence time (sludge age) generally lowers the observed biomass yield, because more cell mass is lost to endogenous decay.
- Adding alum as a coagulant raises the alkalinity and pH of the water being treated.
Show answer and explanation
Answer: B, C
B is correct: below the breakpoint the added chlorine reacts with ammonia to form chloramines and then oxidises them, and only after the breakpoint does extra chlorine remain as free chlorine.
C is correct: the observed yield is Yobs = Y/(1 + kd θc), so a larger θc (sludge age) gives a smaller Yobs.
A is wrong: BOD5 = BODu(1 - e^(-kt)) is only a fraction of the ultimate BOD, so it is always smaller. D is wrong: alum hydrolysis releases acidity, which consumes alkalinity and lowers the pH; lime or soda ash is often added to make up for this.
- Question 7Transportation EngineeringOne or more correct answers
Which of the following statements are CORRECT?
- Stopping sight distance on a level road is the sum of the lag (perception-reaction) distance and the braking distance.
- For a given design speed and superelevation, assuming a higher coefficient of lateral friction increases the minimum radius of a horizontal curve.
- A rigid pavement spreads wheel loads over a wide area mainly through the flexural (slab) action of the concrete, while a flexible pavement spreads them through grain-to-grain contact in its layers.
- For a traffic stream, the time mean speed is always greater than or equal to the space mean speed.
Show answer and explanation
Answer: A, C, D
A is correct: SSD = vt + v²/(2gf) on level ground, the first term being the distance covered during the reaction time and the second the braking distance.
B is wrong: the minimum radius is R = V²/[127(e + f)], so a higher f gives a smaller, not larger, radius.
C is correct: this is the basic difference in load transfer between rigid and flexible pavements.
D is correct: time mean speed exceeds space mean speed by roughly the speed variance divided by the space mean speed, so the two are equal only when every vehicle travels at the same speed.
- Question 8Geomatics EngineeringOne correct answer
A levelling run starts on a benchmark of reduced level 100.000 m. With the first instrument setup, the backsight on the benchmark is 1.425 m and the foresight on a change point is 0.865 m. The instrument is then moved; the backsight on the change point is 2.140 m and the foresight on point P is 1.975 m. The reduced level of P is
- 99.275 m
- 100.725 m
- 101.590 m
- 102.700 m
Show answer and explanation
Answer: B
Height of instrument at setup 1 = 100.000 + 1.425 = 101.425 m, so the change point is at 101.425 - 0.865 = 100.560 m.
Height of instrument at setup 2 = 100.560 + 2.140 = 102.700 m, so RL of P = 102.700 - 1.975 = 100.725 m.
Check: ΣBS - ΣFS = (1.425 + 2.140) - (0.865 + 1.975) = 0.725 m, and 100.000 + 0.725 = 100.725 m.
102.700 m is the second height of instrument, 101.590 m ignores the foresight on the change point, and 99.275 m applies the rise as a fall.
What you get back
The GATE CE on file
GATE Civil Engineering (CE) is one of the largest-volume papers in the GATE family, taken by a very large pool of candidates each year. It is the gateway to M.Tech at IISc, IITs and NITs across Structural Engineering, Geotechnical Engineering, Transportation, Water Resources, and Environmental Engineering, and a recruitment screen for infrastructure and construction PSUs and departments (NHAI, RVNL, IRCON, NBCC, Engineers India, CPWD, state PWDs). The paper spans seven sections — engineering mathematics, structural engineering, geotechnical engineering, water resources engineering, environmental engineering, transportation engineering, and geomatics — with 65 questions in 180 minutes for 100 marks.
- Format
- Seven official sections from the GATE 2026 CE syllabus, modelled at topic level: (1) Engineering Mathematics — linear algebra, calculus with vector calculus, ODE, PDE, probability & statistics, numerical methods (12 marks, 14.1%). (2) Structural Engineering — engineering mechanics, solid mechanics, structural analysis, construction materials & management (PERT/CPM), concrete and steel structures (22 marks, 25.9%, heaviest). (3) Geotechnical Engineering — soil mechanics (classification, seepage, consolidation, shear strength), foundation engineering (bearing capacity, settlement, piles) (14 marks, 16.5%). (4) Water Resources Engineering — fluid mechanics, open-channel hydraulics, hydrology, irrigation (14 marks, 16.5%). (5) Environmental Engineering — water and wastewater treatment, air pollution, municipal solid waste (9 marks, 10.6%). (6) Transportation Engineering — highway geometric design, pavements, traffic engineering (8 marks, 9.4%). (7) Geomatics Engineering — surveying, photogrammetry & remote sensing/GIS (6 marks, 7.1%).
- Candidates
- B.E./B.Tech students in Civil Engineering in their pre-final or final year
- Aspirants targeting M.Tech at IISc, IITs, NITs in Structural, Geotechnical, Transportation, Water Resources, or Environmental Engineering
- PSU job seekers — NHAI, RVNL, IRCON, NBCC, Engineers India, NHPC, and state infrastructure bodies that screen on GATE
- Candidates preparing for state/central engineering services where GATE-level fundamentals overlap
- Repeaters aiming to improve a previous GATE CE rank with a structured, syllabus-aligned plan
- Annual candidates
- 100K+
- Paper duration
- 180 minutes
- Total questions
- 65
- Total marks
- 100
- Core subject marks
- 85 (7 sections)
- Negative marking
- -1/3, -2/3 (MCQ only)
- Calculator
- Virtual on-screen
- Heaviest section
- Structural Engineering (~26%)
- Preparation
- Build a 6-9 month plan: 3-4 months first-pass concept coverage, 2-3 months problem-solving depth, 1-2 months full-length mocks and revision
- Prioritise heavy sections: Structural (22), Geotechnical (14), Water Resources (14), Engineering Math (12) together cover 62 of 85 core marks
- Practice numerical answer type (NAT) problems daily — no negative marking, reward accuracy
- Master limit-state design, Mohr's circle, bearing-capacity and consolidation calculations, open-channel flow, and Manning's equation — these recur heavily
- Solve at least 15 years of previous-year GATE CE questions; pattern recognition is the biggest score multiplier
- Take a full-length 3-hour mock paper weekly from month 5; review every wrong answer the same day
- Maintain a formula notebook — CE spans 200+ standard relations across structures, soil, fluids, environment, and transport
- Do not neglect General Aptitude — 15 marks, easily gained with light practice
- Leads to
- Apply for M.Tech at IISc, IITs, NITs across Structural, Geotechnical, Transportation, Water Resources, Environmental, and Construction Engineering & Management
- Qualify for PSU recruitment via GATE score at NHAI, RVNL, IRCON, NBCC, Engineers India, NHPC and state infrastructure bodies
- Qualify for PhD admission with research fellowship at premier institutes
- Eligible for research and teaching assistantship and JRF positions
- Foundation for international M.S. applications — GATE score recognised by NUS, NTU Singapore and select European universities
- Strengthened core civil fundamentals applicable to construction, consultancy, infrastructure, and government engineering roles
Figures about the real exam, as recorded in the Myndaq course. They describe the real sitting, not this free mock paper - check current details with the exam body before you book.
Reference file for the real GATE CE.
Figures above are as reported for the cycle named in each row and are refreshed each cycle. Sourced, dated facts for this exam (official links on every row) are on the GATE CE course page.
How this mirrors the real format
- The paper structure is the real format: a single timed section, 65 questions in total.
- Timing is server-controlled for the full 3 hr -- closing the tab does not pause the clock, exactly like our paid mock series.
- Marking follows the published paper: the per-section marks shown in the paper map are the marks the scorer applies.
- Navigation is free within a section: you can review and change answers before you submit.
- An on-screen calculator is provided in the sections where the exam allows one.
"Real format" means the paper shape, timing, marking and navigation above - not the official exam software, its visual identity, or any affiliation with the exam body.
What differs or is limited
- This free mock follows the same paper shape, timing, marking scheme and navigation as our paid GATE Civil Engineering mock series. It is scored automatically. It does not include tutor explanations, analysis dashboards or practice content.
- Includes the virtual calculator and free navigation, as in the real exam.
Device and setup checklist
- A stable internet connection for the full duration.
- An on-screen calculator is provided where the exam allows one.
- A laptop or desktop is recommended for the closest exam experience.
One attempt, explicitly
Adding this mock to your account is free and reversible - you can change the exam any time before you begin. Only the confirmed Begin action uses your one attempt. No retake, no reset, no card.